곽성민
한국어를 영어로 영어를 한국어로 자동번역해줘
Jong Bin Kim
한국어를 영어로 영어를 한국어로 자동번역해줘
야호너구리
This document defines the
S ubcontractor Product Assurance R equirement ( for equipment
and/or AIT Subcontractors of the GEO KOMPSAT 3 Payload program.
The intent of this
S PAR is to encourage the use of the subcontractor’s existing documentation and
PA systems to the extent possible in meeting the needs of this fabrication and/or procurement.
Where the subcontractor’s ongoing systems, existing plans, and procedures meet the intent and
content of this S PAR, those may be used as the contract baseline.
The subcontractor shall comply with all contract requirements and have responsibility to supply the
end i tems which conform to this S PAR. If there is conflict between this S PAR and contract
requirements, the contract requirement shall take precedence. If the requirements of this S PAR are
not adequate to achieve the required assurance level of the end item, the subcontractor shall submit
deviation requests with justification for the proposal. Subcontractor’s formats for documenting PA
required tasks and analyses may be used unless o therwise specified herein or by the contract. ETRI
reserves the right to disapprove Subcontractor’s formats if the intent of this S PAR is not satisfied.
j인애
j인애
애드센스
송주봉
대한민국은 정치에 혼재한 정신을 가진 정치인들이 많다
J
Jong Deog Lee
could you tell me how can i use this app
김태환
Sections in this Manual
DC C
2023년 사업선정 15개사 대상 최종점검·성과평가·사업운영위 진행
DC C
2023년 사업선정 15개사 대상 최종점검·성과평가·사업운영위 진행
Load More
→